TWIST workshop advances Digital Risk Twin concept for E8
An expert workshop has helped define how hydrometeorological forecasts, monitoring data and numerical models could be integrated to assist in the daily hazard risk assessment along a section of E8 in northern Norway.

The TWIST workshop at NGI in Oslo brought natural hazard specialists together, on site and online, to discuss how snow avalanches, debris flows and slushflows along E8 in northern Norway can be included in a Digital Risk Twin. ( Graham Gilbert, NGI)
Held at NGI in Oslo on 2 November 2026, the hybrid workshop focused on three hazards: dry-snow slab avalanches, slushflows and debris flows. The findings will inform the Digital Risk Twin concept for TWIST’s approximately 20-kilometre E8 case study.
The aim is to develop a dynamic risk assessment system that accounts for changes in weather and ground or snow conditions change. By linking information about potential release areas, triggering conditions and how far an event could travel, the concept is intended to help road operators assess which sections of road could be affected.
“We want to develop a dynamic risk workflow for these hazards. The workshop brought together the expertise we need to make the concept more concrete,” says TWIST project manager Jessica Chiu.
Building on existing tools
Three specialist groups examined the data, methods and research gaps for each hazard. The discussions confirmed that existing tools provide a useful starting point for snow avalanches and debris flows, while highlighting greater uncertainties for slushflows.
Slushflows occur when water-saturated snow begins to move and can originate in relatively gentle terrain. Limited documentation and difficulties in identifying triggering conditions make them particularly challenging to assess.
“To understand slushflows better, we may need to look beyond the E8 study area. We will also test what existing methods can contribute and where further development is needed,” says Chiu.
The workshop results will feed into a white paper outlining the Digital Risk Twin development roadmap under WP1 (Risk assessment and management) and WP2 (Data acquisition and analysis) and guide the next stages of the E8 case study.
This article was written and reviewed by NGI with support from artificial intelligence (AI).

Jessica Ka Yi Chiu
Senior Engineering Geologist Rock Engineering jessica.ka.yi.chiu@ngi.no+47 968 77 853

Sparsha Sinduri Nagula
Senior Engineer Dam Safety and Hydrodynamics Sparsha.nagula@ngi.no+4796925246
