Zelazny Most mine tailings dam
To ensure the safe operation of the tailings dam at Zelazny Most, NGI has assisted the mining company KGHM Polska Miedz with advanced stability analyses of the dam structure and associated ground. Various measures to stabilize the dam surface have also been evaluated.