3D modelling of rock slope
To make room for a new double track on the Vestfold line, a steep rock slope close to the existing rail line must be adjusted by blasting. NGI has made a 3D rock model of the rock slope.
To make room for a new double track on the Vestfold line, a steep rock slope close to the existing rail line must be adjusted by blasting. NGI has made a 3D rock model of the rock slope.